The A417 Missing Link Project has reached its next phase with ongoing major construction works.
National Highways are working to excavation a new section of road from the Air Balloon roundabout in Birdlip.
Occurring away from the existing route, the strategy aims to limit disruption as much as possible.
All removed materials will be repurposed to reduce the project's carbon footprint.
Nightly closures between the roundabout and the A46 Brockworth junction began on Monday (March 11), and will continue until Friday (March 15) from 9pm to 6am each night.
A diversion is available via the A46, A40, A435 and A436.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here